AI InteleKt Migration: Move Projects Without Losing Context

Migrate into AI InteleKt with an inventory, field map, pilot import, dual-run week, and validation — so prompts, projects, and files survive and operators trust the new system.

By Lee M.Updated Aug 18, 20265 min readFact-checked

Quick answer

Migrate into AI InteleKt with an inventory of projects, prompts, and files you must keep, a field map, a pilot import, a dual-run week, and validation with the people who live in the data — so history survives and the team trusts the new system.

  • Inventory source objects
  • Map fields before bulk load
  • Pilot one site / one role / one team
  • Dual-run for a week
  • Validate with sceptic users

AI InteleKt migration rules

  • Inventory first Typical objects: projects, prompts, and files you must keep.
  • Pilot beats big-bang Prove a small AI InteleKt import before you move everything.
  • Integrations after the pilot Our research does not name specific AI InteleKt integrations, so verify SSO, workspace, and file connectors in the vendor directory before go-live.
  • Do not migrate the wrong job AI InteleKt is AI assistant for a specific job cluster. Do not import a meeting-notes bot or an image studio and expect it to become AI assistant for a specific job cluster.

AI InteleKt migration map

AI InteleKt migration: export, map, pilot, dual-run, cutover.
Prove a small AI InteleKt import before you move the whole operation.

1. Inventory and map

List projects, prompts, and files you must keep. Map required fields and owners. Never invent list prices here — confirm seats, credits, and quote terms on /pricing/ai-intelekt/. Worked example: Harbor Ops (weekly AI users) discovers duplicate employee IDs in the spreadsheet before the first import — and fixes identity before volume.

2. Pilot import

Import one site, one role, or one team. Run complete one real job (prompt → output → share) a non-admin can repeat on the pilot set. Worked example: Harbor Ops (weekly AI users) will not schedule a cutover until the pilot can complete the core job without an admin.

3. Dual-run and cutover

Run old and new in parallel for a week. Spot-check records sceptic users care about, then freeze the legacy source. Worked example: Harbor Ops (weekly AI users) keeps the old export for prompts or files until AI InteleKt matches for seven consecutive days.

AI InteleKt checklist

Bring these questions to every demo

Ask vendors to show the workflow live, not just describe it.

  • 1Inventory source objectsprojects, prompts, and files you must keep
  • 2Run a pilot importOne segment first; fix mapping before bulk.
  • 3Validate with operatorsSpot-check records they care about before cutover.

4. Inventory what must move into AI InteleKt

List users, historical records, templates, and integrations that must survive migration. Mark nice-to-have exports you can leave behind.

Worked example: Harbor Ops (mid-market team) migrates active records only and archives the rest as read-only exports.

5. Run parallel cutover with a rollback path

Keep the old system read-only until AI InteleKt passes non-admin proof. Name a rollback owner and maximum parallel window.

Worked example: Harbor Ops (mid-market team) caps parallel run at two weeks with daily checkpoint notes.

6. Verify counts and permissions after import

Reconcile user counts, role permissions, and a sample of migrated records. List integrations AI InteleKt must connect to and verify native vs manual paths before go-live.

7. Inventory what must move into AI InteleKt

List users, historical records, templates, and integrations that must survive migration. Mark nice-to-have exports you can leave behind.

Worked example: Harbor Ops (mid-market team) migrates active records only and archives the rest as read-only exports.

8. Run parallel cutover with a rollback path

Keep the old system read-only until AI InteleKt passes non-admin proof. Name a rollback owner and maximum parallel window.

Worked example: Harbor Ops (mid-market team) caps parallel run at two weeks with daily checkpoint notes.

9. Verify counts and permissions after import

Reconcile user counts, role permissions, and a sample of migrated records. List integrations AI InteleKt must connect to and verify native vs manual paths before go-live.

10. Inventory what must move into AI InteleKt

List users, historical records, templates, and integrations that must survive migration. Mark nice-to-have exports you can leave behind.

Worked example: Harbor Ops (mid-market team) migrates active records only and archives the rest as read-only exports.

11. Run parallel cutover with a rollback path

Keep the old system read-only until AI InteleKt passes non-admin proof. Name a rollback owner and maximum parallel window.

Worked example: Harbor Ops (mid-market team) caps parallel run at two weeks with daily checkpoint notes.

12. Verify counts and permissions after import

Reconcile user counts, role permissions, and a sample of migrated records. List integrations AI InteleKt must connect to and verify native vs manual paths before go-live.

13. Before you sign with AI InteleKt

Confirm the qualifying plan, non-admin proof, and integration owners in writing. Store quotes next to /pricing/ai-intelekt/ and the evaluation scorecard so finance can audit the same assumptions at renewal.

14. Write the decision memo

Name the job, the qualifying AI InteleKt configuration, and what you are not buying yet. If stakeholders cannot explain why an alternative lost, the trial was not fair.

Frequently asked questions

  • Can we skip the dual-run?

    Only if the dataset is tiny and reversible. Most SMB/mid teams regret skipping a week of parallel use.

  • What if history will not map cleanly?

    Import active records first. Archive messy history as files rather than poisoning the new system of record.